Wetland & Stream Mitigation

Wetland & stream mitigation may be required as part of a US Army Corp of Engineers Section 404 permit or as part of a state environmental permit. The mitigation effort is an environmental offset where the impacts to a wetland or stream impacted by a project are offset by restoring, enhancing, rehabilitating, creating or preserving a wetland or stream in another location.

Categories of Mitigation

Mitigation can generally be divided into two categories:

  • Permittee-Responsible Mitigation (PRM), where the entity receiving authorization to impact wetlands (the permittee) is directly responsible for performing the mitigation and generating the environmental offsets for the impacts.
  • Mitigation Banking, where the entity receiving authorization to impact wetlands compensates a 3rd party (the mitigation banker) to provide offsets. The banker typically generates these offsets at a relatively large site that is capable of generating offsets for a number of individual projects.  Then the offsets are sold as mitigation credits to individual permittees.

There are additional variations on banks, including in-lieu fee programs, single-client banks and others.  These tend to follow the banking model, with some modifications.

Mitigation Experience

Cypress has extensive experience with wetland and stream mitigation.  Our staff have worked within the regulatory system as well as private consulting providing our clients with our unique perspective on the process. Cypress completed restoration and obtained 100% credit release for the first three banks in USACE Mobile District. We have completed analysis of wetland and stream banks across many USACE Districts. Currently, we have 3 mitigation banks in long-term management, 3 in active restoration and multiple additional bank sites in various stages of development and permitting.

Representative Projects

Texas Flat Mitigation Bank: 1985-acre wetland and stream mitigation bank. We completed all environmental studies, permitting, design, and construction management.

Little Biloxi River Mitigation Bank 180-acre wetland and stream mitigation bank. We completed all environmental studies, permitting, design, and construction.

Turtleskin Creek Mitigation Bank: 2740-acre wetland and stream mitigation bank. We completed prospectus development, permitting, and conceptual design for stream and wetland restoration.

Private Client: Savannah District